Meadowgate Regulator: Cylinder repair and modification.
Repair and modification to improve flood control.
Read more about the Hydraulic cylinder repair.
Another large hydraulic cylinder for Forgemasters
Shepcote receive another order from Sheffield Forgemasters.
Read more about the repeat cylinder for Forgemasters.
Orbital O2 2MW Tidal Turbine
Shepcote Engineering continue assisting with bespoke hydraulic cylinders for use in severe marine environments; the latest is for the Orbital 02 2MW Tidal Turbine.
Read more about the Orbital 02 2MW Tidal Turbine.
Large hydraulic cylinder for Forgemasters
Large cylinder manufactured for Sheffield Forgemasters.
Read more about the Hydraulic cylinder for Forgemasters.
Longest hydraulic cylinder repair in the UK
Shepcote have just repaired what is probably the longest hydraulic cylinder in the UK.
Read more about the Hydraulic cylinder repair size.
Hinckley Point C Nuclear Power Plant
Shepcote have completed a prestigious order to supply cylinders for the new Hinckley Point C Power Plant in Somerset.
Read more about Cylinders for Hinckley Point C.
Press Lift Rams
Replacement rams were needed to replace aging units on one of Sheffield Forgemasters largest and most important pieces of plant.
Read more about the Press Lift Rams.
Centre Tube Assembly
Shepcote Engineering were chosen to carry out the redesign and build of a centre tube assembly for a large GRP tank winding mandrel.
Read more about the Centre Tube Assembly.
SR2000 Tidal Energy Project
Shepcote Engineering's vast experience in providing cylinders for use in severe marine environments came to the fore on this project.
Read more about the SR2000 Tidal Energy Project.
Meeting Oil Industry's Exacting Standards
Following on from the work completed over the last few years we look forward to future orders in 2016 for deck handling equipment for pipe and cable laying vessels.
Read more about the Deck Handling Equipment Contract.
Wembley Stadium Seating Project
To maximise the capacity at concerts a hydraulic lifting system was devised to facilitate the raising up of several banks of seating to create space around the stage area.
Read more about the Wembley Stadium Seating Project.
Foryd Harbour Bridge Project
Shepcote Engineering won the contract to design and manufacture hydraulic cylinders for a new £4.2m pedestrian and cycling bridge.
Read more about the Foryd Harbour Bridge Project.
Offshore wind turbine
As the demand for wind power increases and the technology develops so does the size of wind farms and the wind turbines on them, particularly the offshore ones.
Read more about the Offshore wind turbine project.
Krohne Oil & Gas: Euroloop Flowmeter Calibration Laboratories, Rotterdam
Shepcote Engineering's un-paralleled ability to turn, deep hole bore and finish hone large pipes for large state-of-art test complex dedicated to the testing and calibration of large flow meters for the oil and gas industry.
Read more about the Krohne Oil & Gas Project.
SR250 Tidal Energy Project
Shepcote Engineering's vast experience in providing cylinders for use in severe marine environments came to the fore on this project.
Read more about the SR250 Tidal Energy Project.
SeaGen Tidal Energy Project
Shepcote Engineering was chosen to supply the main lift rams for the world's first tidal energy system situated at Strangford Lough, Northern Ireland.
Read more about the SeaGen Tidal Energy Project.
Please contact us for further information.