Maximising Capacity at Wembley Stadium

To maximise the capacity at concerts a hydraulic lifting system was devised to facilitate the raising up of several banks of seating to create space around the stage area.

This enabled the owners to move the stage back from its original location on the playing surface.

Shepcote Engineering was chosen to supply the hydraulic force required to do this.

To achieve the required lift, eighteen 8 metre stroke displacement type telescopic cylinders were supplied.

Please contact us for further information on this prestigious project.